Search Results: 23 vacancies

 ...customers to become more productive, energy efficient and sustainable for more than 80 years....  ...including working with planning and cost/estimating to understand budget allocations...  ...could adversely affect delivery of the contractual programme. Responsible for the timely... 
Duba
more than 2 months ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Verifying that all necessary inspections and tests, as required of the project and statutory regulations... 

Air Products (Middle East) FZE

Duba
1 day ago
 ...below, budget and in accordance with our contractual obligations. Responsible for...  ...complete the deliverables in agreed time and cost. Provide leadership, coordination across...  ...technology and the capabilities and efficiencies of specific engineering software for use... 

Systra

Duba
a month ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Verifying that all necessary inspections and tests, as required of the project and statutory regulations... 

Air Products (Middle East) FZE

Duba
1 day ago
 ...Procedures, PQP, ITP, Method statement, Manufacturer’s Lamination Procedures & and reporting deviations from management system / contractual requirements of the projects. Review subcontractor’s ITPs for GRP piping works Verify qualification records of Subcontractor... 

Air Products (Middle East) FZE

Duba
1 day ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Verifying that all necessary inspections and tests, as required by the project and statutory regulations... 

Air Products (Middle East) FZE

Duba
14 hours ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Verifying that all necessary inspections and tests, as required of the project and statutory regulations... 

Air Products (Middle East) FZE

Duba
14 hours ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Site Inspection to Verify that all necessary inspections and tests, as required of the project and... 

Air Products

Duba
14 hours ago
 ...specification, and scope of work growth. Assisting schedule control with delay analyses for extension of time Claims Issuing Contractual letters to the Owner Day-to-day guidance and direction of the Commercial Managers on the NEOM Green Hydrogen Project. Embody... 

Air Products (Middle East) FZE

Duba
4 days ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Verifying that all necessary inspections and tests, as required of the project and statutory regulations... 

Air Products (Middle East) FZE

Duba
1 day ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP, method statements and reporting deviations from the management system and contractual requirements of the project. Verifying that all necessary inspections and tests, as required of the project and by statutory... 

Air Products (Middle East) FZE

Duba
1 day ago
 ...be responsible for: The successful execution of all the instrument and electrical scope in accordance with the project schedule, cost and other KPIs. Responsibility for the safe execution of the work being supervised. The in-direct management of a team of instrument... 

Air Products (Middle East) FZE

Duba
14 hours ago
 ...all turbine installation activities are to be executed in a safe manner considering the highest standards of safety, quality, and efficiency. The Machinery Engineer is to manage the turbine OEM installation operations on site and to provide technical expertise during... 

Air Products (Middle East) FZE

Duba
1 day ago
 ...jointing ~ Monitors fabrication activities to ensure high work efficiency and that quality and689= workmanship meet project standards and...  ...quality requirements. Maintains effective schedule and cost control within assigned field functions of the project and ensures... 
Duba
more than 2 months ago
 ...new wiring or repairing existing systems Estimating materials costs and labor hours to complete projects Working with architects...  ...other departments to ensure that electrical work is completed efficiently Monitor the Sub-Contractor’s resources and productivity, and... 
Duba
more than 2 months ago
 ...planning and execution either with the General Contractors (GCs) or with a sub-contracted heavy lift contractor Ensuring that contractual arrangements for major lifts meet the needs of the project and that suitable terms and conditions are in place. Ensuring that... 
Duba
more than 2 months ago
 ...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects. Verifying that all necessary inspections and tests, as required by the project and statutory regulations... 

Air Products (Middle East) FZE

Duba
25 days ago
 ...right first-time reporting. Participate in weekly project reviews meetings. Perform trend analysis and actively evaluate project cost and schedule performance to identify potential risk areas, validate forecasts, and communicate those quickly to key stakeholders.... 

Air Products (Middle East) FZE

Duba
25 days ago
 ...expected to: Embody the 4S culture of Safety, Speed, Simplicity and Self-Confidence Ensure that the warehouse operates at peak efficiency — with customer satisfaction the primary goal — by supervising, organizing, and training warehouse employees and establishing,... 

Air Products (Middle East) FZE

Duba
25 days ago
 ...Responsible for all aspects of the package design during the lifetime of the package until complete the deliverables in agreed time and cost. The manager shall be a prime point of contact for the aspects of project including Design proposals, data gathering,... 

Systra

Duba
22 days ago