Search Results: 22 vacancies
...to global markets. The project is scheduled to be onstream in 2026.
JOB DETAILS
Division: PMO
REPORTS TO: Chief Executive Officer, Executive Director Projects
POSITION SUMMARY
Manage of NGHC Integrated Management System development
Manage development of...
...project, with a large number of executing parties, engineering offices, global suppliers, modular fabrication, and construction sites... ...with delay analyses for extension of time Claims
Issuing Contractual letters to the Owner
Day-to-day guidance and direction of the...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Verifying that all necessary inspections and tests, as required of the project and statutory regulations...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Verifying that all necessary inspections and tests, as required of the project and statutory regulations...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Verifying that all necessary inspections and tests, as required of the project and statutory regulations...
...Monitoring and implementation of QMS Procedures, PQP, ITP, method statements and reporting deviations from the management system and contractual requirements of the project.
Verifying that all necessary inspections and tests, as required of the project and by statutory...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Verifying that all necessary inspections and tests, as required by the project and statutory regulations...
...Procedures, PQP, ITP, Method statement, Manufacturer’s Lamination Procedures & and reporting deviations from management system / contractual requirements of the projects.
Review subcontractor’s ITPs for GRP piping works
Verify qualification records of Subcontractor...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Site Inspection to Verify that all necessary inspections and tests, as required of the project and...
...commercial impacts which could adversely affect delivery of the contractual programme.
Responsible for the timely preparation of legal... ...Excellent knowledge and proficiency with the Microsoft office suite (Excel, Word, PowerPoint, One Note) and collaborative tools...
...independently and with minimal supervision
Outstanding report writing and presentation preparation skills
Excellent in using Office Software tools (Word, Excel, Powerpoint, Sharepoint etc)
Attention to details and high level of accuracy.
Good analytical and...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Verifying that all necessary inspections and tests, as required of the project and statutory regulations...
...planning and execution either with the General Contractors (GCs) or with a sub-contracted heavy lift contractor
Ensuring that contractual arrangements for major lifts meet the needs of the project and that suitable terms and conditions are in place.
Ensuring that...
...Monitoring and implementation of QMS Procedures, PQP, ITP & method statements and reporting deviations from management system / contractual requirements of the projects.
Verifying that all necessary inspections and tests, as required by the project and statutory regulations...
...existing work and developing new projects by assuring on schedule completion, within or below, budget and in accordance with our contractual obligations.
Responsible for managing multidiscipline infrastructure packages from concept design to issue for construction...
...timely manner for Materials Control can MRR into Smart Materials (SPMat) & issues OS&D for any discrepancies for resolution by Home Office and/or Construction.
Be a “Hands on” Warehouse Manager with a can-do attitude to understand where all materials are located on...
...Job Description
POSITION SUMMARY
The administrative assistant role will be for the NEOM/Duba Site office KSA reporting to Project Manager Power Network NGHP.
PRINCIPAL DUTIES AND RESPONSIBILITIES
Manage site administration
Manage Car rentals at...
...least 10 years of piping supervisor experience
Demonstrating an ability to supervise a team
Showing proficiency in Microsoft Office
Being able to do physical work for long hours
Being able to work a flexible schedule
Strong analytical thinking and problem...
...of Neom.
This position's complexity is derived from the size of this project with a high amount of executing parties, engineering offices, and construction sites at the same time.
This individual will ensure the effective delivery of the sales targets. The position...
...Proficient in ACUMEN FUSE software or similar risk simulation tools.
Proficient in Primavera P6 and risk management software like (e.g., ARM, PRA).
Proficient in MS Office and EVMS tools.
SAP (or equivalent ERP) and EcoSys experience is added advantage....