Search Results: 2 vacancies

 ...test cases for all phases of the testing lifecycle to include, system testing, unit testing, performance testing, 508 testing and...  ...Experience coordinating system, integration, UAT, full end-to-end/operational readiness testing, task tracking and testing tools (such as... 

Allied Services International Pvt. Limited.

Diriyah
4 days ago
 ...stages of design or other design frameworks and understand the total fire concept: from the client brief through to construction and operation, the fire engineering challenges relevant to different design stages and the level/type of fire engineering input required to... 

Ignis Global Recruitment

Diriyah
4 days ago