Search Results: 83 vacancies
...SENIOR COMBINED CYCLE POWER PLANT PROCESS ENGINEER
POSITION SUMMARY
The Jazan IGCC is the world’s largest IGCC (Integrated Gasification... ...) facility processing up to 100,000BPD of vacuum residue to generate 2100 MMSCFD syngas.
The 4 GW Combined Cycle Power Generation...
...Job Description and Qualifications
Purpose
To provide Power Automation (PSA) & Power Management System (PMS) engineering oversight... ...Load shedding
# Load Restoration
# Black Start System
# Generation Control System
# Generation Shedding System
# Automatic...
...producing 2100 MMSCFD syngas, 18,000 MT/Day Oxygen and 4 Gigawatts of power. Facilities and assets include residue gasification, acid gas... ...energy projects at scale, and driving the industry forward to generate a cleaner future.
At Air Products, we work in an environment...
...producing 2100 MMSCFD syngas, 18,000 MT/Day Oxygen and 4 Gigawatts of power. Facilities and assets include residue gasification, acid gas... ....
- Monitor project expenditures and variations, generating accurate and timely cost reports and forecasts for stakeholders...
...other stake holders
Constructability studies where required to generate innovative ideas of problem solving as well as giving guidance... ...of 15 years in the Construction Management of Projects in power or oil/gas industries (mainly related to Mechanical field)
Saudi...
...control and start-up sequences of process units: Gasification, Hydrogen, AGRU, SARU, Sulphur recovery unit, utilities, steam & power generation Proficient with use of document storage software. Good interpersonal skill, familiar with leading a multi-disciplined team of...
...producing 2100 MMSCFD syngas, 18,000 MT/Day Oxygen and 4 Gigawatts of power. Facilities and assets include residue gasification, acid gas... ...energy projects at scale, and driving the industry forward to generate a cleaner future.
At Air Products, we work in an environment...
...Maintenance Management Systems), supporting multiple businesses within the IGCC site. This includes the entire Gasification units, Power Generation & overall Utilities inclusive of ASU. SAP is the primary database.
They define the setup and structure of all databases...
...the active usage of Constructability Studies and Workshops to generate alternatives to execute the project and ensure that all aspects... ...experience of 15 years in the Construction Management of Projects in power or oil/gas industries (mainly related to Architectural, Civil...
...imaginer ce qui est possible
The Jazan Integrated Gasification & Power Company (JV) is a 3 partner, $12bn JV that is closely... ...go to 10 gas turbines that together with 5 heat recovery steam generator and 5 stream turbines will produce 33000 ton of steam and 4000MW...
...SUMMARY
The Jazan IGCC is the world’s largest IGCC (Integrated Gasification Combined Cycle Power Plant) facility processing up to 100,000BPD of vacuum residue to generate 2100 MMSCFD syngas.
Further processing units include Acid Gas Removal, Soot Ash Recovery, Sulphur...
...Science or equivalent.
Experience within the Oil and Gas and power plants is required.
Experience in material receiving... ...certification.
Electrical equipment, motors, transformers, generators, sub-stations, cables, accessories, etc.
Loop checking, cable...
...POSITION SUMMARY
Purpose
Jazan Integrated Gasification and Power Company (JIGPC) is looking for a Senior Project Engineering... ...in Brown Field Projects.
~ Knowledge of Gasification, Power generation, Sulphur Removal, Solids Handling, and Waste-water treatment will...
...The Jazan IGCC is the world’s largest IGCC facility processing up to 100,000BPD of vacuum residue to generate 2100 MMSCFD syngas used for H2, steam and 3.8 GW of power generation. The facility is located in the Jazan Economic City, in the province of Jazan, KSA. JIGPC...
...新構想無限可能
Purpose
The Jazan Integrated Gasification & Power Company (JV) is a 3 partner, $12bn JV that is closely integrated... ...go to 10 gas turbines that together with 5 heat recovery steam generator and 5 stream turbines will produce 33000 ton of steam and 4000...
...The Jazan IGCC is the world’s largest IGCC facility processing up to 100,000BPD of vacuum residue to generate 2100 MMSCFD syngas used for H2, steam and 3.8 GW of power generation. The facility is located in the Jazan Economic City, in the province of Jazan, KSA. JIGPC...
...skills and qualifications
Three or more years of experience in mining data as a data analyst
Extensive experience in the Microsoft Power Platform – MS PowerApps, MS Power Automate (Flow), Power BI and Power virtual agents.
Strong SQL or Excel skills, with aptitude...
...documents.
Skills
The successful candidate will:
Have broad knowledge of Electrical and Instrumentation systems including power supply systems, DCS systems, electrical and instrument field equipment and associated construction and testing methodology.
Lead...
...Job Description and Qualifications :
PROJECT SUMMARY
Air Products, Saudi Aramco and ACWA Power are in final negotiations to form an over $11 billion Gasification/Power joint venture (JV) located at Jazan Economic City (JEC) in Saudi Arabia.
The JV will purchase...
...experience.
Bachelor’s degree /HND or Diploma in Mechanical Engineering, Science or equivalent.
Experience in the Oil and Gas and power plants is required.
Experienced in material receiving inspection and verification.
Mechanical and piping QC Experience during...