Search Results: 9 vacancies
...related field.
Deep knowledge of GIS technologies and software tools used such as ArcGIS, QGIS, etc.
The ability to analyze geographic data, analyze satellite images, and apply spatial analysis.
Excellent analytical skills and ability to interpret geographic...
...material, equipment, & outside services needed.
Calculate the financial justification for the project.
DIMENSIONS:
Geographical Scope: Jazan IGCC
Facilities: Estimated
21 Functional Locations or Plant areas
Budget Impact: Approx. $170MM in FY 2024...
...understand SAP and key business processes and are uniquely qualified to create and lead Maintenance databases.
Dimensions
Geographical Scope: Jazan IGCC
Facilities: Estimated
21 Functional Locations or Plant areas
Budget Impact: Approx. $170MM in FY 2024...
...operational with the minimal disruption to plant on-streams.
Dimensions
All equipment at the Power Block Cogen I & II
Geographical Scope: Power Block
Budget Impact: Approx. $78MM in FY 2024
Replacement investment of facility
$3.0BB
Number of...
...Strong analytical skills and ability to provide innovative solutions.
Experience in using ancillary engineering programs and geographic information systems.
Ability to deal with technical specifications and engineering designs.
Effective communication and teamwork...
...surveying engineering or a related field.
Deep knowledge of the foundations and principles of surveying, aerial photography, and geographic information systems.
Ability to use advanced surveying tools and techniques such as remote sensors and Global Positioning...
...in decision making (technical, production, & commercial)
III. Dimensions
All equipment at the Power Block Cogen I & II
Geographical Scope: Power Block
Budget Impact: Approx. $78MM in FY 2024
IV. Skills
Practical experience and know-how of Electrical engineering...
...system integrity in line with JIGPC defined standards.
III. Dimensions
All equipment at the Power Block Cogen I & II
Geographical Scope: Power Block
Budget Impact: Approx. $78MM in FY 2024
Replacement investment of facility
$3.0BB
IV. Skills...
...entire Gasification units, Power Generation & overall Utilities inclusive of ASU. SAP is the primary database.
Dimensions:
Geographical Scope: Jazan IGCC
Facilities: Estimated
21 Functional Locations or Plant areas
Budget Impact: Approx. $170MM in FY 2024...